中文
Cite this article:沈默,王洋,苏秀永.抽水蓄能电站施工测量控制网建设流程关键技术[J].灌溉排水学报,,():-.
SHENMo,WANGYang,suxiuyong.抽水蓄能电站施工测量控制网建设流程关键技术[J].灌溉排水学报,,():-.
【Print this page】   【Download the full text in PDF】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
Archive    Advanced Search
This article has been:Browse 843Times   Download 0Times  
Font:+|=|-
DOI:
Key technology for construction process of construction survey control network of pumped storage power station
SHENMo, WANGYang, suxiuyong
Zhejiang Huadong Mapping and Engineering Safety Technology Co., Ltd
Abstract:
The smooth construction of pumped storage power station is inseparable from the construction survey control network. The whole life cycle of construction survey control network will involve technical problems such as how to choose a site for construction, observation and calculation, and also economic problems such as land use and compensation for logging. Combined with previous work practice, the construction process of construction survey control network and matters needing attention in each link are elaborated in detail, so as to provide reference for similar work in the future.
Key words:  pumped storage power station; Construction survey control network; Retest and data maintenance