中文
Cite this article:李路明,潘益斌,李高会.某长距离四期配水工程水力学设计[J].灌溉排水学报,,():-.
Li Lu-ming,pan yi bin,li gao hui.某长距离四期配水工程水力学设计[J].灌溉排水学报,,():-.
【Print this page】   【Download the full text in PDF】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
Archive    Advanced Search
This article has been:Browse 1654Times   Download 0Times  
Font:+|=|-
DOI:
HysimCity Software for Water Engineering Simulation Water Hammer Protection in Long-Distance Diversion Project
Li Lu-ming, pan yi bin, li gao hui
Huadong Engineering Corporation Limited,Powerchina
Abstract:
Based on Designing and application of a long-distance pressure water projects, setting up calculation by using our developed simulation software HysimCity, Analysis Water hammer accident condition of pump power off Proposed a two-stage pilot closing of valves which are setting outlet of pumps and pipes and compound air valves for Water hammer protection measures jointly, The results show that the protective measures are effective.
Key words:  water-supply project; pump power off; water hammer protection; HysimCity