English
引用本文:鲁显赫,高庆方,王新福,等.无为大堤防洪保护区河道建模方法研究[J].灌溉排水学报,2019,38(1):116-121.
LU Xianhe,GAO Qingfang,WANG Xinfu,et al.无为大堤防洪保护区河道建模方法研究[J].灌溉排水学报,2019,38(1):116-121.
【打印本页】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 1809次   下载 3794 本文二维码信息
码上扫一扫!
分享到: 微信 更多
无为大堤防洪保护区河道建模方法研究
鲁显赫, 高庆方, 王新福, 王封祚
黄河勘测规划设计有限公司, 郑州 450003
摘要:
使用MIKE软件对地形数据进行网格剖分时,河道易被概化失去其原有的行洪能力。【目的】寻找合适的河道建模方法。【方法】通过总结三角形网格方案、混合型网格方案、一二维耦合方案共3种建模方案,并分别建立模型,对结果进行了对比分析。【结果】三角形网格方案建模时,河道易被概化失去过水能力;混合型网格方案建模时,河道过水能力接近实际,但河岸与保护区接边处易发散;一二维耦合方案建模时,河道过水能力较好,但易忽略堤防薄弱处的洪水风险。三角形网格方案宜在计算精度要求高、计算时间充足时,将河道网格加密后使用;混合型网格方案建模时,河岸处理过程复杂,但计算速度较加密后的三角形网格方案约提高2倍,是替代三角形网格的重要方案之一;一二维耦合方案建模时,计算速度较加密后的三角形网格方案约提高5倍,但计算精度取决于断面间距的选取,宜在河道堤防高程差别不大时使用。【结论】河道作为保护区内的主要行洪通道,建模方案的选择会改变其行洪能力的强弱,进而必然影响洪水风险分析结果,可根据分析区域的特点选择合适的建模方法。
关键词:  洪水风险分析; MIKE; 建模方法; 数值模拟
DOI:10.13522/j.cnki.ggps.20180258
分类号:
基金项目:
Comparison of Different Spatial Meshes for Modelling Water Flow in Flood-control Protection Area of Wuwei Levee
LU Xianhe, GAO Qingfang, WANG Xinfu, WANG Fengzuo
Yellow River Consulting Company, Zhengzhou 450000, China
Abstract:
【Objective】Meshing the terrain in use of the MIKE model to simulate water flow in river could give rise to errors in calculating the ability of the channel to conduct water, and this paper aims to compare the performance of different mesh methods. 【Method】We compared the pros and cons of triangular mesh network, the hybrid grid network and the one-dimension two-dimension coupling scheme.【Result】The triangular mesh resulted in errors in calculating water flow in the channel. The hybrid network was adequate to describe water flow in the river, but led to a dispersive interface between the river bank and the protection area. The two-dimensional coupling scheme captured water flow in the river, but underestimated the risk of flood in the embankment area. Triangular mesh was computationally demanded but gave accurate results by refining the meshes in the river. The hybrid grid scheme was computationally complicated, but was two time faster than the triangle grid scheme. The two-dimensional coupling scheme was five times faster than the triangle grid scheme, but its accuracy depends on spacing of the cross-section and it was suitable only when the river embankment is not much higher than the river bed.【Conclusion】The channel acts as the main flood channel in flood-controlled protected area, and different meshes could give different results and they are case-dependent and therefore should be used with care.
Key words:  flood risk analysis; MIKE; moder; numerical simulation