中文
Cite this article:
【Print this page】   【Download the full text in PDF】   View/Add Comment  【EndNote】   【RefMan】   【BibTex】
←Previous Article|Next article→ Archive    Advanced Search
This article has been:Browse 1848Times   Download 4206Times 本文二维码信息
scan it!
Font:+|=|-
DOI:10.13522/j.cnki.ggps.20180520
Using HEC-HMS Model to Simulate Flooding in Zijingguan Watershed
KANG Yanfu, LI Jianzhu, MA Qiushuang
1.Xingtai Hydrology and Water Resources Survey Bureau of Hebei Province, Xingtai 054000, China;2.State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300350, China
Abstract:
【Objective】 HEC-HMS is a hydrological model to simulate rainfall-runoff process at basin scale, and the purpose of this paper it to apply it to simulate flooding in Zijingguan watershed. 【Method】 Based on available hydrological, meteorological and land surface data, we divided the watershed into 11 sub-watershed. The HEC-HMS model was built based on runoff generation and flow, and it was validated against14 flood events measured in the watershed. 【Result】 The runoff generation parameters in all sub-watersheds were approximately the same, but the flow parameters varied due to the difference in topography between the sub-watersheds. The errors of the simulated peak discharge was < 20%, with RSE ranging from 0.51 to 0.95. 【Conclusion】 The model can reproduce the measured runoff generation and flow in Zijingguan watershed, and can thus be used to predict flooding in the catchment.
Key words:  Zijingguan watershed; HEC-HMS hydrological model; flood simulation