中文
Cite this article:
【Print this page】   【Download the full text in PDF】   View/Add Comment  【EndNote】   【RefMan】   【BibTex】
←Previous Article|Next article→ Archive    Advanced Search
This article has been:Browse 1820Times   Download 3350Times 本文二维码信息
scan it!
Font:+|=|-
DOI:10.13522/j.cnki.ggps.20180676
A Method to Determine the Crest Level in the Surge-preventing Shaft in Irrigation Network with Open Pipe Conveyances
GONG Zhihao, JIANG Xiaohong, WU Weifeng, CHEN Yan
1. Yangzhou University, Yangzhou 225009, China; 2. Shanghai Water Conservancy Management Agency, Shanghai 200002, China
Abstract:
【Objective】 The purpose of this paper is to present a method to improve determination of the crest level in the surge-preventing shaft in irrigation systems with open pipe conveyances. 【Method】 The method was based on the principle of water balance and energy conservation, in which we maximized the water level in the tank to derive the crest level by simulating the irrigation system under all possible operation conditions. We validated the method against a low-pressure pipe irrigation system at Qingpu irrigation district in Shanghai, China.【Result】 The water level in the surge-preventing shafts obtained from the simulated results varied from 4.18 m to 4.49 m, it was comparable with the design crest level of 4.8m to 5.0m, meeting the operation requirement. 【Conclusion】 Testing the proposed method against a real irrigation system revealed that the calculated crest level in the surge-preventing shaft was appropriate and reliable .
Key words:  low-pressure pipe irrigation; surge shaft; crest level; water level; operation condition; simulation